A Lodgewick company - serving San Jose, CA
A new modern detached ADU in a backyard

Junior ADU & Interior Conversion Cost - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in San Jose
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A new sunroom addition with three walls of windows
A kitchenette inside a converted garage
A second-story addition that matches the existing roofline
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

How Much Does Junior ADU & Interior Conversion Cost in San Jose?

In San Jose, a junior accessory dwelling unit (JADU) conversion inside an existing home typically costs between $65,000 and $135,000, while a full interior conversion of a garage or bonus room into an attached ADU runs $120,000 to $235,000 in 2026. Those are realistic, written-on-the-page numbers for this market, where permit fees, seismic requirements, and labor rates all run higher than the California average. Most homeowners we work with land somewhere in the $95,000 to $170,000 range for a completed, permitted, ready-to-rent space.

If you’re looking for a straight answer before making a single phone call: a junior ADU inside your existing footprint is the most affordable path to a legal rental unit in San Jose, and a garage conversion costs roughly 40 to 60 percent less than building a detached ADU from the ground up. We’ll break down exactly where those dollars go below.

At Lodgewick ADU San Jose, led by Russ Delmar, we put every price in writing before work begins. No allowances that balloon later, no “we’ll see when we open the wall.” The Kingswell Guarantee covers that in writing.

Key Takeaways:

  • JADU conversion (existing bedroom or attached space): $65,000 – $135,000
  • Garage-to-ADU interior conversion: $120,000 – $235,000
  • Permit and impact fees in San Jose alone: $8,000 – $25,000
  • Timeline: JADUs average 3 – 5 months; garage conversions average 4 – 8 months
  • The Kingswell Guarantee: written price, written guarantee, 365-Day Done Right Promise
  • Free estimates: call (669) 266-4319
A compact kitchen inside a new ADU

Junior ADU & Interior Conversion Cost Breakdown (2026)

Here’s what a San Jose homeowner should expect to pay, line by line, based on current 2026 rates for licensed contractors in Santa Clara County. These figures come from completed projects across neighborhoods like Willow Glen, Cambrian, Berryessa, Almaden Valley, and the Rose Garden area.

Cost Item JADU (Interior Conversion) Garage / Large Interior ADU
Design & architectural drawings $3,500 – $6,500 $6,000 – $12,000
Permit & impact fees (City of San Jose) $8,000 – $15,000 $12,000 – $25,000
Demolition & rough framing $4,000 – $8,000 $10,000 – $22,000
Electrical (panel, wiring, fixtures) $7,000 – $14,000 $12,000 – $24,000
Plumbing (kitchenette/bath) $8,000 – $18,000 $14,000 – $30,000
Kitchenette or kitchen $6,000 – $15,000 $15,000 – $35,000
Bathroom (or half bath) $7,000 – $14,000 $12,000 – $28,000
Drywall, insulation & paint $5,000 – $10,000 $9,000 – $18,000
Flooring $2,500 – $6,000 $5,000 – $12,000
HVAC (mini-split or tie-in) $4,000 – $9,000 $7,000 – $16,000
Doors, windows & egress $2,000 – $6,000 $6,000 – $14,000
Finishes, fixtures & trim $3,000 – $8,000 $7,000 – $16,000
Contractor overhead & profit (15 – 25%) $10,000 – $25,000 $20,000 – $50,000
Typical total range $65,000 – $135,000 $120,000 – $235,000

What pushes a project toward the top or bottom of those ranges? The honest answer: scope and surprise. A JADU that converts an existing bedroom with a closet and a wet bar will land on the low end. A JADU that requires moving walls, opening a ceiling for plumbing, or upgrading a 100-amp electrical panel will push past $110,000. A garage conversion where the slab has settled, the roof sags, or the existing framing doesn’t meet current seismic code will land on the high end.

In Willow Glen, we regularly see older homes with knob-and-tube wiring hiding in walls built in the 1930s and 1940s. That’s a $6,000 to $12,000 correction before any new work begins. In Almaden Valley, bigger garages and newer homes usually convert more cleanly. Every project gets a written price before we start, and that price is what we honor.

What Affects Junior ADU & Interior Conversion Pricing in San Jose

San Jose is not a generic California market. Our costs are shaped by specific local realities, and anyone giving you a price based on “averages” without accounting for these factors is guessing. Here’s what actually moves the number:

  • San Jose ADU permit and impact fees. The City of San Jose charges school impact fees, park fees, and development fees on ADU projects. For a JADU under 500 square feet, expect $8,000 to $15,000. For a larger garage conversion, plan on $12,000 to $25,000 before a single tool touches the property.
  • Seismic and structural requirements. Santa Clara County sits in one of the most active seismic zones in the country. If your project requires shear wall upgrades, foundation bolting, or roof reinforcement, that adds $5,000 to $18,000 depending on what’s behind your existing walls.
  • Electrical panel capacity. Most San Jose homes built before 1990 have 100-amp panels. A JADU with an electric cooktop and mini-split HVAC will often require a 200-amp upgrade at $4,000 to $7,000. If your panel is a Zinsco or Federal Pacific model, PG&E may require replacement before you can pull a permit.
  • Whether the space already has plumbing nearby. In a home where the bathroom shares a wall with the proposed JADU, plumbing costs stay modest. In a garage on the far side of a concrete slab, running a new sewer line up to 40 feet adds $6,000 to $14,000.
  • Finish level. A rental-ready JADU with laminate counters, a basic kitchenette, and standard tile can be completed for the entry-level numbers above. Homeowners who want quartz counters, luxury vinyl plank flooring, and custom cabinetry push the budget 20 to 30 percent higher.
  • Site access. Homes in the Naglee Park or Hensley Historic District neighborhoods often have narrow driveways, limited staging space, and parking restrictions on crews. Tight access adds labor hours and, occasionally, material delivery complications.

Russ Delmar walks every homeowner through this list during the initial consultation. By the time you receive a written price, you’ll know exactly which of these factors apply to your property and what each one costs.

A new modern ADU with wood cladding

Is It Cheaper to Convert Interior Space Than Build a Detached ADU?

Yes, and the difference is significant. A detached ADU in San Jose runs $250,000 to $450,000 when you include foundation work, utility trenching, and full site development. An interior conversion or JADU reuses your existing foundation, roof, and exterior walls, which eliminates anywhere from $60,000 to $120,000 in structural costs alone.

Here’s what the comparison looks like in real 2026 numbers:

  • Detached new-build ADU (up to 1,000 sq ft): $280,000 – $450,000
  • Attached ADU addition: $200,000 – $350,000
  • Garage conversion ADU: $120,000 – $235,000
  • Junior ADU inside existing home: $65,000 – $135,000

There’s another factor worth knowing: JADUs have a faster permit path in San Jose. The City streamlined JADU approvals to encourage more affordable rental housing. Many JADU projects clear planning review in 6 to 10 weeks, while a detached ADU can spend 4 to 7 months in review. Time is money, especially if you’re carrying a construction loan or losing potential rental income.

If you want a deeper comparison, see our guide to Junior ADU & Interior Conversion in San Jose for what each path involves from a permitting and construction standpoint.

Can You Convert a Garage Into a JADU in San Jose?

Technically, no: a JADU must be within the footprint of the existing primary dwelling, usually a converted bedroom, office, or bonus room with an added kitchenette. A garage conversion is classified as a detached or attached ADU depending on how the garage connects to the home. But in practice, many San Jose homeowners run both projects concurrently: a JADU inside the house plus a garage conversion, on the same property, under one master permit.

Here’s something most homeowners don’t know until their first planning meeting: San Jose allows both a JADU and an ADU on the same single-family lot. That’s two rentable units from one property, both potentially in high demand in a rental market where a one-bedroom in San Jose averages $2,600 to $2,900 per month as of 2026.

At those rental rates, a JADU at the $90,000 mark pays for itself in about three and a half years of occupancy. A garage conversion at $170,000 pays back in roughly five years. Those are the numbers lenders look at when you apply for ADU financing.

How Long Does a Junior ADU or Interior Conversion Take in San Jose?

Plan for 3 to 5 months from the day you sign a contract for a JADU, and 4 to 8 months for a larger garage conversion or interior ADU. That timeline includes permit approval, inspections, and final sign-off from the City of San Jose.

The variables that stretch timelines are predictable: PG&E scheduling for a panel upgrade can add 2 to 6 weeks, and permit plan-review corrections can consume a month when a homeowner’s initial drawings miss a current building code requirement. We handle permits as part of every package, so our timeline estimates come from projects we’ve completed across Santa Clara County, not from hopeful guesswork.

Our crews follow The Kingswell Way: show up in the window we gave you, work clean, communicate every day, and hand you a finished project with a written guarantee. If we say 12 weeks, the calendar matters to us.

How to Save on Junior ADU & Interior Conversion

You can’t change what San Jose charges in permit fees, and you shouldn’t cut corners on electrical or plumbing. But there are legitimate ways to bring a project in at the lower end of the ranges above without sacrificing durability or code compliance:

  • Start with the space you already have. Every wall you move, every ceiling you open, every door you relocate adds $4,000 to $12,000. A JADU that works within the existing room layout is the single biggest money saver in ADU construction.
  • Choose a mini-split over tying into your central HVAC. Connecting an ADU to an existing central system in a San Jose home frequently requires duct modifications and a larger condenser. A dedicated mini-split runs $4,000 to $9,000 installed and gives the tenant independent temperature control.
  • Buy materials before the permit clears. The 6 to 10 week plan-review window for a JADU is a good time to lock in pricing on cabinets, fixtures, and flooring. Prices on imported tile and plumbing fixtures fluctuate more than cabinetry and framing lumber.
  • Use a prefab kitchenette rather than custom cabinetry. Prefabricated kitchen units from manufacturers we work with regularly run $3,000 to $7,000 less than custom builds while delivering the same function. We’re hands-on with materials from Abodu, Cover, Dvele, Mighty Buildings, Boxabl, and Plant Prefab, and we can match a prefab solution to nearly any JADU footprint.
  • Keep the existing door and window openings. Moving an opening means cutting framing, adding headers, and often triggering additional structural review in a seismic zone. If the existing opening works, leave it alone.

The best way to save is to get a real number early. Our estimates are free, and the price we put in writing is the price we build to. Call (669) 266-4319 to schedule a site walk.

FAQs – Junior ADU & Interior Conversion Cost

How much does a JADU cost in San Jose in 2026?

A junior ADU in San Jose costs $65,000 to $135,000 for a completed, permitted unit, with most projects landing between $85,000 and $105,000. The final number depends on whether you already have plumbing and electrical capacity nearby; a ground-up retrofit of a space with no existing utilities pushes toward the top of the range. We’ll give you a written price after a site walk, at no cost, so you know your number exactly. Call (669) 266-4319 to schedule one.

Is it cheaper to convert my garage or build an ADU from scratch?

A garage conversion costs $120,000 to $235,000 in San Jose, while a new detached ADU runs $250,000 to $450,000. The conversion saves 40 to 60 percent because you reuse the foundation, roof, and three walls. If your garage slab is in good structural condition and the existing roof framing meets code, the savings hold. We evaluate slab condition during every initial walkthrough and include any necessary corrections in the written price before we start.

Does a JADU add value to a home in San Jose?

Appraisers in the Bay Area typically credit a permitted JADU at $50 to $85 per square foot beyond the cost to build, which means a 500-square-foot JADU at $105,000 often appraises $25,000 to $40,000 above construction cost on day one. The rental income story matters more for resale than the physical square footage: buyers see a unit generating $2,600 a month and calculate it for themselves.

What permits do I need for a JADU in San Jose?

A JADU requires a building permit from the City of San Jose, which usually includes plan review, structural review, and periodic inspections from the start of framing through final occupancy. Expect $8,000 to $15,000 in total permit and impact fees for a typical JADU. Lodgewick ADU San Jose files all permits as part of every project package, and we stand behind the inspection process with The Kingswell Guarantee: if something doesn’t pass, we fix it at no additional cost.

Can you finish a JADU in 3 months?

For a straightforward JADU inside an existing bedroom or bonus space, yes: 3 to 4 months is realistic when permits clear on schedule and PG&E doesn’t delay a panel upgrade. The key is choosing a contractor who sequences the work correctly: rough framing, then inspections, then trades, not all at once. Our project calendar is part of the written scope, and if we miss a date we told you, the guarantee kicks in. Chat with Lodgewick ADU San Jose about bringing a project plan to life by calling (669) 266-4319.

Why San Jose Homeowners Choose Lodgewick ADU San Jose

We’re not a handyman crew that decided to try ADUs. We’re an ADU builder, period. Lodgewick ADU San Jose is the ADU company of the Kingswell family, and we’ve specialized in accessory dwelling units, garage conversions, and home additions since 2010. A lodge is a small house on a larger property. That’s what we build.

Every project operates under The Kingswell Guarantee: a written price before work begins, a defined arrival window, a clean job site, and a written guarantee on every job. If the work fails within the 365-day guarantee period, we come back and make it right, at no cost to you. That’s the 365-Day Done Right Promise, and it’s in writing on every contract before a single nail goes in.

Our technicians are background-checked and uniformed, so you always know who’s at your door. When you call (669) 266-4319, a live person answers, day or night. No voicemail loop, no “we’ll get back to you within 48 hours.” You reach a human who can answer questions about your project, your estimate, or your guarantee.

We work hands-on with the ADU brands and materials homeowners ask about most: Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie. If a prefab interior kit fits your budget and timeline, we’ll tell you. If a stick-built conversion is the better value, we’ll tell you that too. The point is to match the material to your lot, your budget, and your timeline, not to force one product onto every project.

If you’ve been let down before, by a price that changed at the door or a contractor who never showed, the difference will be obvious from the first conversation. We say the price before we start. We show up in the window we gave you. We leave the job site cleaner than we found it. And we put the guarantee in writing.

From our home page, you can learn more about The Kingswell Guarantee and how a JADU project works from first estimate to final walkthrough.

Pricing reflects the San Jose market as of 2026. Lodgewick ADU San Jose offers free estimates – call (669) 266-4319.

What Our Customers Say

★★★★★ 5.0 from 3+ reviews

"Converted our garage into a rental studio. The crew was respectful of the neighbors and kept the site clean. It's bringing in rent now and paid for itself faster than I expected."

- Grace Yoon

"Built a backyard unit for my mother in law. They handled the permits, gave me a real timeline, and stuck to it within a few days. The written price is what we paid, which anyone who's done construction knows is rare."

- Dennis Fairchild

"Added a suite for my dad. They walked us through every cost before a hammer swung and stuck to it. The written price is what we paid, no change orders."

- Ingrid Salazar

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Lodgewick in San Jose

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your San Jose team

A local crew that works across San Jose and the towns around it, to the same written standard as every Lodgewick location.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in San Jose? Licensed & insured · Written quotes before work starts response · free estimates
Call (669) 266-4319

Request a Free Estimate

Tell us what's going on in San Jose - we'll get back to you fast. No obligation.

When you send us your details, you confirm you have read our Privacy Policy and agree to be contacted by call, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch